Modified the base attachments on two Chillers in Milpitas.
We drilled 12 inches into the concrete and epoxied a 5/8″ stainless steel all thread using Simpson Set XP epoxy.

The initials CEL where written by the inspector indicating the welds passed inspections.
There were 8 total locations
I used E7018 welding rod, a rod which can be used in all Structural applications were mild steel is being welded.
Leave a comment
No comments yet.
Leave a Reply