Structural Steel Erecting in Sacramento

Some of you may guess the small building we are working on.  I’ll give you a hint – you can see the color of the joist used for this auto parts store.

Dan and Karl shook the deck out and tacked down in one day.

We came back about 1-1/2 months after we finished the deck to install these two awnings.

 

Advertisements

Welding on a Lattice Cell Tower

The rusted looking areas are the locations we need to weld

This is the base of one of the legs of a three legged tower we worked on in May, 2012.  This tower is in Fortuna, CA just south of Eureka.  The weather was very nice for working when I was there, overcast and cool.  However, when Dan was there they couldn’t work one of the days due to rain and wind.  All the welding was done using flux core wire, E70T-8.

 

Cell Tower Modification in Modesto

On this cell tower we added 12 gussets to the base plate of the tower and reinforced the port holes.

This was the easy side to get to

The gussets are about 6″ wide at the base and approximately 14″ tall.

I had to make like a mole to get in this hole

Sometimes half the battle is getting to where you need to be and then to see the joint that needs to be welded.